The last major refurbishment of the hall took place in 1997 and, though maintenance of the building has been undertaken on a regular basis, the Trustees have recognised that there is a need for a further upgrading of the facilities. As a result the Hall recently had:
- a modern multi-media system installed with a ceiling mounted projector, drop down screen and high quality audio system.
- the stage area replastered and painted
- the hall curtains (including the stage curtains) were recently replaced with the help of a grant
- re-pointing of sections of the external walls
Future plans include installing wi-fi, upgrading the kitchen, modernising the lighting system and refreshing the floor.